Project Proposal

Job ID: 32102906

Budget: $30 – $250 USD

The project consist of a graph
Details for Graph
• Plot energy absorbed on impact vs. temperature for each sample.
Note: 2 graphs in total (From provided data sets)
Note: 3 curves per graph
(a) 1018 steel (blue)
(b) 4140 steel (red)
(c) Aluminum 6060 (green)
(Data set will be provided )