Hybrid Construction Waste Prediction Model

Job ID: 38338494

Budget: ₹1,500 – ₹12,500 INR

i need to make model for construction waste prediction using MATLAB program the models will be hybrid models which are Grey Wolfe optimization algorithm integrated with ANN and ANFIS and Archimedes Optimization algorithm integrated with ANN and ANFIS the Optimization algorithm will be used as feature selection algorithm