Harmonic Analysis for high speed rail installation at 132kV -- 2

Job ID: 35491588

Budget: $250 – $750 SGD

need to design the ac traction circuit for high speed rail at 132kV by using the Matlab simulink. The result that needed it Total harmonic distortion for voltage & current and power quality for the circuit.