Use metaheuristic optimization technique to solve an optimization problem.

Job ID: 32014316

Budget: $30 – $250 USD

In the UC problem, the objective function and constraints are utilized to achieve the
minimum generation cost for no. of electricity generation units or Maximizing
Profits, taking into consideration group of constraints to satisfy power balance,
initial state of units, and minimum up/down time of units.