Semiconductor Fab Production Scheduling Model
Budget: $750 – $1,500 USD
Hello,
I'd like to build a mathematical model which outputs which job should I schedule on which equipment at a given time of the day. The input parameters to the model would be as follows:
1. # Jobs to be processed
2. # Operators available in a planning horizon
3. # Equipment's available in a planning horizon
4. Processing batch size of equipment
5. Cycle time of equipment for process
6. Setup time of equipment for process
The system constraints are as follows:
1. Sequence of process steps the job has to follow
2. Capacity constraints of the equipment's
3. Capacity constraints of the operators
Regards
I'd like to build a mathematical model which outputs which job should I schedule on which equipment at a given time of the day. The input parameters to the model would be as follows:
1. # Jobs to be processed
2. # Operators available in a planning horizon
3. # Equipment's available in a planning horizon
4. Processing batch size of equipment
5. Cycle time of equipment for process
6. Setup time of equipment for process
The system constraints are as follows:
1. Sequence of process steps the job has to follow
2. Capacity constraints of the equipment's
3. Capacity constraints of the operators
Regards