Real estate apartment project cost estimation

Job ID: 39813312

Budget: ₹37,500 – ₹75,000 INR

My consultancy is finalising several National Highway packages alongside a few large high rise building contracts, all under Indian Government tender procedure. I need complete, audit-ready cost estimates that follow the latest Schedule of Rates (SOR) while reflecting current market prices for every item.

For the highway components I rely on MX Roads, so prior hands-on experience with that software is essential; I expect clean model files, generated quantities and rate abstracts straight from MX along with your explanatory notes. Building estimates must be produced with the same rigour, tying every BOQ line back to the applicable SOR entry or a clearly justified market quotation.

Deliverables for each package
• Item-wise BOQ with quantities derived from drawings or MX outputs
• Rate analysis sheet: SOR reference or market backup, overheads and contingencies separated
• Summary cost abstract in XLS and signed PDF
• Assumption log covering design data, traffic volumes (for highways) and material lead distances

Acceptance criteria
• Quantity take-offs match design drawings within ±2 %
• All SOR codes cited correctly; any market-rate item accompanied by at least two recent quotations
• MX Roads files open without missing references and regenerate the same quantities on my system
• Final abstract totals reconcile with detailed line items to the last rupee

Accuracy, transparency and the ability to defend every figure during technical scrutiny are critical. Share two comparable highway and two building estimates you completed recently, preferably those that cleared CVC or third-party checks. A concise approach note outlining your workflow in MX Roads and your method for tracking market fluctuations will speed up selection.