NS2 Project- Enhancing QoS in MANET using modified AODV
Budget: $200 – $400 USD
Hello,
I need help with my research project and I need it before 1/8/2021. I need to modify the existing AODV with priority and link failure prediction. I am unable to add the modifications to the codes. Basically what I'm trying to do is combining 2 solutions from 2 papers. I just need help with the codes.
I need help with my research project and I need it before 1/8/2021. I need to modify the existing AODV with priority and link failure prediction. I am unable to add the modifications to the codes. Basically what I'm trying to do is combining 2 solutions from 2 papers. I just need help with the codes.