Refactor & Upgrade Laravel + Vue 3 Platform
Budget: $15 – $25 USD
Project: Complete Refactor & Security Upgrade — Laravel + Vue 3 Platform
- Objective
We are looking for a senior full-stack developer (Laravel + Vue 3) to refactor and upgrade our existing web platform to a 10/10 level in security, scalability, stability, and code quality. The current codebase functions, but it must be professionally restructured to reach production-grade standards.
Scope Overview:
The goal is to deliver a codebase that is:
Fully secure (no secrets in repo, headers, CSP, HSTS, rate-limiting, etc.)
Modular and scalable (feature-based architecture, centralized API services, Pinia store)
Clean and maintainable (zero warnings, lint + CI passing)
Properly tested and monitored (unit/integration tests + error tracking)
Optimized and stable (faster load, modular build, CI/CD pipeline)
- Security Requirements (Before Development)
Before starting development, all critical credentials must be rotated:
VPS access keys
Backup system credentials
Email/SMTP credentials
This ensures a clean and secure environment with no legacy or unauthorized access.
- Detailed Work Plan (Milestones and Deliverables)
Each milestone must be delivered as a separate, verifiable GitHub Pull Request (PR) with commits and live verification on the staging environment.
Each PR must be approved before the next milestone begins.
-Phase 0 – Critical Security & Containment (12 h)
Remove secrets from the repo and rotate credentials.
Enforce HTTPS, secure cookies, .env.example template.
Add security headers (HSTS, CSP enforce, X-Frame-Options, Referrer-Policy).
Restrict CORS to official domains.
Add rate-limiting to critical routes.
Deliverable: PR merged; headers, rate limits, and credential rotation verified via staging.
- Phase 1 – Stable Toolchain & Build (12 h)
Update Node LTS, Vue 3, Vite, Axios.
Clean vite.config, Tailwind setup, and aliases.
Remove dev-only assets (Telescope, etc.).
Add ESLint + Prettier.
Deliverable: PR with successful npm run build, lint green, and verified dev/prod builds.
- Phase 2 – Frontend Quality & Cleanup (20 h)
Standardize Composition API and props/emits.
Centralize Axios with interceptors (auth, error handling).
Remove hardcoded or redundant logic.
Deliverable: PR deployed; no console warnings; HTTP layer unified.
- Phase 3 – Architecture & Modularization (18 h)
Reorganize app by features (auth, listings, auctions, payments).
Implement Pinia for global state.
Add Laravel Form Requests for validation.
Deliverable: PR with verified modular folder structure and working states.
-Phase 4 – App & Payment Security (16 h)
Strengthen backend validation and CSRF/XSS protection.
Review and enforce guards/policies.
Add Stripe webhook verification and idempotency.
Run composer/npm audit.
Deliverable: PR approved after OWASP checklist passes; payment flow verified.
- Phase 5 – Logging & Error Handling (8 h)
Structured logging + rotation.
Integrate Sentry or Bugsnag (front + back).
Add safe 4xx/5xx pages.
Deliverable: PR verified; Sentry logs visible and anonymized.
- Phase 6 – Testing (18 h)
Add PHPUnit, Vitest/Jest, and Cypress/Playwright tests for core flows.
Deliverable: PR merged only after all tests pass in CI.
- Phase 7 – Performance & UX (12 h)
Code-splitting, lazy loading, image optimization.
Eager loading and caching for backend.
Deliverable: PR with measurable improvement (Lighthouse + DB queries).
- Phase 8 – CI/CD & Repo Governance (8 h)
Set up GitHub Actions (lint + test + build + audit).
Branch protection, CODEOWNERS, Dependabot.
Update README, CONTRIBUTING, and release checklist.
Deliverable: PR approved; CI pipeline green and documentation complete.
- Total Time: 126 hours (maximum, strictly capped)
No extra hours will be approved under any circumstances.
Final delivery deadline: October 31st, 2025.
All milestones must be delivered and approved before this date.
-Payment & Penalty Policy
Late delivery penalty: 20% deduction per day of delay after the final deadline (31 Oct 2025).
Each milestone is paid only after:
1. Code is merged, reviewed and approved on GitHub.
2. The feature works correctly on the staging server.
3. Checklist is signed off by the project owner.
- Developer Requirements
4+ years professional experience in Laravel 9/10 and Vue 3.
Strong expertise in CSP, HSTS, rate-limiting, OWASP standards.
CI/CD experience (GitHub Actions or GitLab CI).
Stripe Connect & webhook security experience.
Clean, modular, test-driven code discipline.
Professional communication and milestone-based delivery.
- Communication & Validation
All communication and payments must remain inside Freelancer.com.
Daily progress updates required.
Each phase must include:
GitHub PR for code review.
Functional validation on staging.
Documented milestone checklist confirmation.
- Goal: Deliver a production-ready, fully secure, modular, and high-performance Laravel + Vue 3 platform with full code auditability and long-term scalability
- Objective
We are looking for a senior full-stack developer (Laravel + Vue 3) to refactor and upgrade our existing web platform to a 10/10 level in security, scalability, stability, and code quality. The current codebase functions, but it must be professionally restructured to reach production-grade standards.
Scope Overview:
The goal is to deliver a codebase that is:
Fully secure (no secrets in repo, headers, CSP, HSTS, rate-limiting, etc.)
Modular and scalable (feature-based architecture, centralized API services, Pinia store)
Clean and maintainable (zero warnings, lint + CI passing)
Properly tested and monitored (unit/integration tests + error tracking)
Optimized and stable (faster load, modular build, CI/CD pipeline)
- Security Requirements (Before Development)
Before starting development, all critical credentials must be rotated:
VPS access keys
Backup system credentials
Email/SMTP credentials
This ensures a clean and secure environment with no legacy or unauthorized access.
- Detailed Work Plan (Milestones and Deliverables)
Each milestone must be delivered as a separate, verifiable GitHub Pull Request (PR) with commits and live verification on the staging environment.
Each PR must be approved before the next milestone begins.
-Phase 0 – Critical Security & Containment (12 h)
Remove secrets from the repo and rotate credentials.
Enforce HTTPS, secure cookies, .env.example template.
Add security headers (HSTS, CSP enforce, X-Frame-Options, Referrer-Policy).
Restrict CORS to official domains.
Add rate-limiting to critical routes.
Deliverable: PR merged; headers, rate limits, and credential rotation verified via staging.
- Phase 1 – Stable Toolchain & Build (12 h)
Update Node LTS, Vue 3, Vite, Axios.
Clean vite.config, Tailwind setup, and aliases.
Remove dev-only assets (Telescope, etc.).
Add ESLint + Prettier.
Deliverable: PR with successful npm run build, lint green, and verified dev/prod builds.
- Phase 2 – Frontend Quality & Cleanup (20 h)
Standardize Composition API and props/emits.
Centralize Axios with interceptors (auth, error handling).
Remove hardcoded or redundant logic.
Deliverable: PR deployed; no console warnings; HTTP layer unified.
- Phase 3 – Architecture & Modularization (18 h)
Reorganize app by features (auth, listings, auctions, payments).
Implement Pinia for global state.
Add Laravel Form Requests for validation.
Deliverable: PR with verified modular folder structure and working states.
-Phase 4 – App & Payment Security (16 h)
Strengthen backend validation and CSRF/XSS protection.
Review and enforce guards/policies.
Add Stripe webhook verification and idempotency.
Run composer/npm audit.
Deliverable: PR approved after OWASP checklist passes; payment flow verified.
- Phase 5 – Logging & Error Handling (8 h)
Structured logging + rotation.
Integrate Sentry or Bugsnag (front + back).
Add safe 4xx/5xx pages.
Deliverable: PR verified; Sentry logs visible and anonymized.
- Phase 6 – Testing (18 h)
Add PHPUnit, Vitest/Jest, and Cypress/Playwright tests for core flows.
Deliverable: PR merged only after all tests pass in CI.
- Phase 7 – Performance & UX (12 h)
Code-splitting, lazy loading, image optimization.
Eager loading and caching for backend.
Deliverable: PR with measurable improvement (Lighthouse + DB queries).
- Phase 8 – CI/CD & Repo Governance (8 h)
Set up GitHub Actions (lint + test + build + audit).
Branch protection, CODEOWNERS, Dependabot.
Update README, CONTRIBUTING, and release checklist.
Deliverable: PR approved; CI pipeline green and documentation complete.
- Total Time: 126 hours (maximum, strictly capped)
No extra hours will be approved under any circumstances.
Final delivery deadline: October 31st, 2025.
All milestones must be delivered and approved before this date.
-Payment & Penalty Policy
Late delivery penalty: 20% deduction per day of delay after the final deadline (31 Oct 2025).
Each milestone is paid only after:
1. Code is merged, reviewed and approved on GitHub.
2. The feature works correctly on the staging server.
3. Checklist is signed off by the project owner.
- Developer Requirements
4+ years professional experience in Laravel 9/10 and Vue 3.
Strong expertise in CSP, HSTS, rate-limiting, OWASP standards.
CI/CD experience (GitHub Actions or GitLab CI).
Stripe Connect & webhook security experience.
Clean, modular, test-driven code discipline.
Professional communication and milestone-based delivery.
- Communication & Validation
All communication and payments must remain inside Freelancer.com.
Daily progress updates required.
Each phase must include:
GitHub PR for code review.
Functional validation on staging.
Documented milestone checklist confirmation.
- Goal: Deliver a production-ready, fully secure, modular, and high-performance Laravel + Vue 3 platform with full code auditability and long-term scalability
Related categories:
JavaScript
Laravel
Stripe
Vue.js
Security
GitHub
API Development
PHPUnit
Tailwind CSS
CI/CD