Laravel frontend Revamp & Feature Additions
Budget: $10 – $30 USD
There are 4–8 discrete tasks I’d like completed on an existing Laravel application. The work spans both the front-end and the back-end, with the emphasis on introducing new features while giving the interface a fresh, responsive look.
On the feature side I need functionality added that touches both layers of the stack, so solid knowledge of Laravel controllers, models, Blade templates, and the usual JavaScript / CSS workflow is essential.
For the interface itself, the goals are:
• A layout redesign that feels lighter and more intuitive.
• Noticeable improvement in responsiveness across mobiles, tablets, and desktop.
• A handful of interactive elements (think dynamic panels, modal flows, or similar) to make the user experience smoother.
Code should be clean, commented, and committed in small, testable chunks so I can review progress task-by-task. If you’ve worked with component libraries such as Tailwind, Bootstrap, or Vue/React bridges inside Laravel, mention it in your bid—those skills will help us move faster.
I’m ready to start as soon as we agree on the milestones and can supply the current repo and a clear list of the 4–8 tasks on day one.
On the feature side I need functionality added that touches both layers of the stack, so solid knowledge of Laravel controllers, models, Blade templates, and the usual JavaScript / CSS workflow is essential.
For the interface itself, the goals are:
• A layout redesign that feels lighter and more intuitive.
• Noticeable improvement in responsiveness across mobiles, tablets, and desktop.
• A handful of interactive elements (think dynamic panels, modal flows, or similar) to make the user experience smoother.
Code should be clean, commented, and committed in small, testable chunks so I can review progress task-by-task. If you’ve worked with component libraries such as Tailwind, Bootstrap, or Vue/React bridges inside Laravel, mention it in your bid—those skills will help us move faster.
I’m ready to start as soon as we agree on the milestones and can supply the current repo and a clear list of the 4–8 tasks on day one.