Scheduling algorithm (FCFS,SJF,RR) using Java

Job ID: 35092584

Budget: $10 – $30 USD

I already wrote 90% of the code, but got stuck when it came to memory limit and sorting data entry to memory as required by the teacher in note number 4 and also had problems with RR (Round Robin). Attached is the project details and my code it just needs editing to work as required the details.