CONSTRUCTION
Budget: £20 – £250 GBP
construction technology assignment
the assignment is about infrastructure and a scenario in given in regards to an existing site which needs to be talked about through this assignment
just need the pass criteria doing so that means p6,p7,p8 and p9
the assignment is about infrastructure and a scenario in given in regards to an existing site which needs to be talked about through this assignment
just need the pass criteria doing so that means p6,p7,p8 and p9