Terminate 80 AHU Connections (In Kondapur Location) Hyderabad India
Budget: ₹3,000 – ₹5,000 INR
I need an experienced electrical technician on-site at Kondapur to terminate eighty (80) air handling units. The job involves running the cables from each EC fan up to its corresponding external PVC junction box, making all final terminations, and fitting two new control switches in the same area along with the required material as mentioned below.
Sr. No. Item Description (Full Form) Qty
1 PVC Box, 1 No
2 DIN Rails 1 No
3 DPDT Selector Switches (Double Pole Double Throw Switch) 1 No
4 SPST Selector Switches (Single Pole Single Throw Switches) 1 No
5 Local / Remote Control Label 1 No
6 BMS / Manual Label 1 No
7 TBS – Terminal Blocks (20 Nos.) 20 Nos
This is a live commercial building, so I will supply the exact safety and compliance checklist that must be observed before work starts—lock-out/tag-out, earthing verification, insulation testing, and all local electrical codes. Please be ready to document each step for our facilities log.
Standard-grade PVC conduit, copper conductors, and surface-mount switches are acceptable; you only need to bring familiar tools (megger, crimper, multimeter, and tagging, etc.) and your labor. Once everything is wired, I expect a continuity test and a brief functional run of every AHU to confirm correct rotation and switch operation.
Deliverables:
• All 80 AHU terminations completed, including the above-mentioned material, labelled and photographed
• Final inspection report including test readings and sign-off on the safety checklist
If you can start soon and commit to finishing without disrupting building operations, message me with your proposed timeline and recent commercial HVAC-electrical experience.
Sr. No. Item Description (Full Form) Qty
1 PVC Box, 1 No
2 DIN Rails 1 No
3 DPDT Selector Switches (Double Pole Double Throw Switch) 1 No
4 SPST Selector Switches (Single Pole Single Throw Switches) 1 No
5 Local / Remote Control Label 1 No
6 BMS / Manual Label 1 No
7 TBS – Terminal Blocks (20 Nos.) 20 Nos
This is a live commercial building, so I will supply the exact safety and compliance checklist that must be observed before work starts—lock-out/tag-out, earthing verification, insulation testing, and all local electrical codes. Please be ready to document each step for our facilities log.
Standard-grade PVC conduit, copper conductors, and surface-mount switches are acceptable; you only need to bring familiar tools (megger, crimper, multimeter, and tagging, etc.) and your labor. Once everything is wired, I expect a continuity test and a brief functional run of every AHU to confirm correct rotation and switch operation.
Deliverables:
• All 80 AHU terminations completed, including the above-mentioned material, labelled and photographed
• Final inspection report including test readings and sign-off on the safety checklist
If you can start soon and commit to finishing without disrupting building operations, message me with your proposed timeline and recent commercial HVAC-electrical experience.