Stacked Compressor 25 ton HVAC

Job ID: 36878821

Budget: $1,500 – $3,000 USD

An existing 25 ton chilled water system is not controlling latent heat because the distributed water is on average above 45 degrees F. The system has five 5 ton geothermal chillers. In the winter the heat load is typically seven or eight tons. One unit is cycling on and off with a five minute hot start delay. The result is an average water temperature of about 53 degrees. System needs a variable speed chiller or buffer tank.
Related categories: Mechanical Engineering HVAC