Commercial HVAC Load Calculation
Budget: ₹750 – ₹1,250 INR
I need a detailed set of heating- and cooling-load calculations for a new commercial building. You will be working from a complete, well-organised blueprint package in DWG/PDF, so room data extraction should be straightforward.
The goal is an engineer-ready report that lets me size equipment, justify ventilation rates, and move on to downstream duct design without re-work. Please use an industry-recognised tool such as HAP, TRACE 700, Carrier’s E20, or an equivalent spreadsheet model and reference the latest ASHRAE fundamentals in your methodology. AutoCAD familiarity is important because you may need to pull areas and exposures directly from the drawings.
Deliverables (acceptance criteria)
• Room-by-room and block cooling/heating loads with sensible/latent split
• Ventilation rate summary in cfm/L · s (ASHRAE 62.1)
• Psychrometric conditions and design assumptions (outdoor DB/WB, indoor set-points)
• Equipment sizing tables ready for schedule insertion
• Native calculation file plus a clear PDF report
Attach a short note on your preferred software and turnaround time when you bid so I can line up the hand-off of the blueprints.
The goal is an engineer-ready report that lets me size equipment, justify ventilation rates, and move on to downstream duct design without re-work. Please use an industry-recognised tool such as HAP, TRACE 700, Carrier’s E20, or an equivalent spreadsheet model and reference the latest ASHRAE fundamentals in your methodology. AutoCAD familiarity is important because you may need to pull areas and exposures directly from the drawings.
Deliverables (acceptance criteria)
• Room-by-room and block cooling/heating loads with sensible/latent split
• Ventilation rate summary in cfm/L · s (ASHRAE 62.1)
• Psychrometric conditions and design assumptions (outdoor DB/WB, indoor set-points)
• Equipment sizing tables ready for schedule insertion
• Native calculation file plus a clear PDF report
Attach a short note on your preferred software and turnaround time when you bid so I can line up the hand-off of the blueprints.
Related categories:
Excel
CAD/CAM
Civil Engineering
AutoCAD
Thermal Analysis
Environmental Engineering
HVAC