Petrel 2023 Compositional Reservoir History Matching – 5 Wells, Gas & Water Production (90% Accuracy)
Budget: $30 – $250 USD
There is a reservoir with five wells. The task is to perform history matching for the five horizontal wells, mainly aiming to match the reservoir’s overall cumulative production, daily production, gas-oil ratio, and water cut, as well as the same metrics for individual wells.
For now, we only need to match the water and gas production of the five wells.
I’ll send you the original geological model, because the one I modified is too messy.
File link:https://drive.google.com/drive/folders/182Ko7fWhkYS7TWlwwYkzHJiEnX8E3iNa?usp=drive_link
Specific requirement:
Use a compositional model
Perform constant-liquid-rate matching
Wells: A3H, A4H, A5H, A12H, A13H
Match water and gas production
Time range: Complete it by **July 21, 2025**.
Matching accuracy: over 90%
Software version: Petrel 2023
Deliverables:
Fully set up simulation project using the provided geological model in Petrel 2023.
Compositional model with constant liquid rate applied.
History matching of water and gas production for all five wells from June 1, 2023 to June 2, 2025.
Matching accuracy must exceed 90% for all matched parameters.
Deliverables:
Complete Petrel project file (or exported case)
Screenshots or plots comparing historical vs simulated water and gas production (per well and overall)
Matching evaluation report (or brief notes) including accuracy assessment (e.g., R² or error plots)
Any additional scripts or simulation input files (if applicable)
Let me know your estimated time and cost.
For now, we only need to match the water and gas production of the five wells.
I’ll send you the original geological model, because the one I modified is too messy.
File link:https://drive.google.com/drive/folders/182Ko7fWhkYS7TWlwwYkzHJiEnX8E3iNa?usp=drive_link
Specific requirement:
Use a compositional model
Perform constant-liquid-rate matching
Wells: A3H, A4H, A5H, A12H, A13H
Match water and gas production
Time range: Complete it by **July 21, 2025**.
Matching accuracy: over 90%
Software version: Petrel 2023
Deliverables:
Fully set up simulation project using the provided geological model in Petrel 2023.
Compositional model with constant liquid rate applied.
History matching of water and gas production for all five wells from June 1, 2023 to June 2, 2025.
Matching accuracy must exceed 90% for all matched parameters.
Deliverables:
Complete Petrel project file (or exported case)
Screenshots or plots comparing historical vs simulated water and gas production (per well and overall)
Matching evaluation report (or brief notes) including accuracy assessment (e.g., R² or error plots)
Any additional scripts or simulation input files (if applicable)
Let me know your estimated time and cost.