Restaurant Relocation Feasibility Plans
Budget: $250 – $750 USD
I have a 0.15-acre restaurant site in Hillsboro, Oregon (street view here: https://maps.app.goo.gl/qmyjsRrrhEzP8rNi7). Instead of tearing everything down and triggering a full “new build” permit, I want to reposition or extend the existing structure intelligently. The target areas are the entry/lobby, kitchen-dining zones, and storage-utility sections, leaving as much of the core footprint intact as possible.
What I need now is a combined feasibility and drafting service:
• Speak directly with the City of Hillsboro and Washington County planning & building departments on my behalf to confirm what qualifies as “alteration” versus “new construction,” any threshold square-foot or structural limits, parking or ADA implications, and the submittal sequence.
• Produce clear schematic site and floor plans (AutoCAD, Revit, or SketchUp are all fine) that illustrate the partial relocation/extension concept, so officials can react to something concrete.
• Summarize the conversations and code references in writing, highlighting any tweaks we can make to stay within the simpler permit path.
Accuracy to Oregon Structural Specialty Code, energy, fire/life-safety, and restaurant health rules is essential; the drawings must be detailed enough for a formal pre-application meeting.
If the study shows a green light, I expect to award a second phase for the full permit set, so please keep layer naming, scaling, and file organization consistent for easy handoff.
Let me know your proposed timeline, similar projects you have handled in Oregon, and how you prefer to structure communications with the authorities.
What I need now is a combined feasibility and drafting service:
• Speak directly with the City of Hillsboro and Washington County planning & building departments on my behalf to confirm what qualifies as “alteration” versus “new construction,” any threshold square-foot or structural limits, parking or ADA implications, and the submittal sequence.
• Produce clear schematic site and floor plans (AutoCAD, Revit, or SketchUp are all fine) that illustrate the partial relocation/extension concept, so officials can react to something concrete.
• Summarize the conversations and code references in writing, highlighting any tweaks we can make to stay within the simpler permit path.
Accuracy to Oregon Structural Specialty Code, energy, fire/life-safety, and restaurant health rules is essential; the drawings must be detailed enough for a formal pre-application meeting.
If the study shows a green light, I expect to award a second phase for the full permit set, so please keep layer naming, scaling, and file organization consistent for easy handoff.
Let me know your proposed timeline, similar projects you have handled in Oregon, and how you prefer to structure communications with the authorities.
Related categories:
CAD/CAM
Building Architecture
AutoCAD
SketchUp
Architectural Engineering
Architecture