Keith valley poultry farm and tucker poultry farm
Budget: $3,000 – $5,000 USD
2 poultry farms on same tract. Bank is requiring geotechnical report for both farms. Need completed in 1.5 weeks time. I’ve attached soil erosion plans and survey. Keith valley farm tract A and Tucker poultry tract b.
Related categories:
Geotechnical Engineering