MINE PLANNING AND OPTIMISATION USING NPV METHOD
Budget: $30 – $250 AUD
Based on the information for the mineral deposit given, design a suitable mining system in detail for the shallow part of the deposit. Need to do technical analysis and report writing.
Related categories:
Engineering
Civil Engineering
Geology
Mining Engineering
Geotechnical Engineering