MINE PLANNING AND OPTIMISATION USING NPV METHOD

Job ID: 33432439

Budget: $30 – $250 AUD

Based on the information for the mineral deposit given, design a suitable mining system in detail for the shallow part of the deposit. Need to do technical analysis and report writing.