I need an Excel Expert
Budget: €750 – €1,500 EUR
I have two lists:
- a bill of material showing with the following columns: product code, drawing no., qty
- a list of product with the following columns: product code, delivery date first lot, qty lot 1, delivery date lot 2, qty lot 2
I need to allocate the product of the second list to the drawings of the first list, showing the latest date of reception of material for each drawing .
- a bill of material showing with the following columns: product code, drawing no., qty
- a list of product with the following columns: product code, delivery date first lot, qty lot 1, delivery date lot 2, qty lot 2
I need to allocate the product of the second list to the drawings of the first list, showing the latest date of reception of material for each drawing .