Established Textile Unit having a Capacity of 20 Ton at Zero Liquid Discharge
Budget: ₹750 – ₹1,250 INR
• Served my knowledge in Aarti International Pvt. Ltd as a Site engineer for establishing a Dyeing & Processing unit as well as Effluent treatment plant of 2Mld equipped with Italian Technology. (1june,2017- Feb,2019).
• Construction of Pre Engineering Building of 100m x 140m.
• Fabrication of Pipe Rack Structure for supplying of Steam and Water Lines of 2000m.
• Laying Of Roads.
• Strong interpersonal relationship management communication skills with the ability to Co-ordinate with
Project members, Consultants & Contractors.
• Providing engineering disciplines when administering and review work performed by consultants and
others.
• Manage all the records that can be easily accessible to anyone at anytime.
• Estimating quantities, Cost and testing of materials, and labor to determine the project feasibility.
• Prepare reports and presentations as per desired.
• Construction of Pre Engineering Building of 100m x 140m.
• Fabrication of Pipe Rack Structure for supplying of Steam and Water Lines of 2000m.
• Laying Of Roads.
• Strong interpersonal relationship management communication skills with the ability to Co-ordinate with
Project members, Consultants & Contractors.
• Providing engineering disciplines when administering and review work performed by consultants and
others.
• Manage all the records that can be easily accessible to anyone at anytime.
• Estimating quantities, Cost and testing of materials, and labor to determine the project feasibility.
• Prepare reports and presentations as per desired.