Early-Stage construction cost estimate

Job ID: 31326152

Budget: $30 – $250 AUD

prepare a report to the company’s investors analyzing in detail, the factors that influenced the accuracy of early-stage construction cost estimates. The report should convey the message that even though you allowed
for anticipated cost variations in your early-stage cost estimate, those analyzed factors caused
final construction cost to vary significantly, which is beyond your control and beyond the limits of anticipation