Stormwater Study & SWPPP Plan

Job ID: 40126986

Budget: $10 – $30 USD

I have a new development moving into design and need a full stormwater management study that will flow straight into our SWPPP submittal package. The scope is strictly for a green-field site, so nothing has been built yet and there is no legacy infrastructure to work around.

The study must address three items I have already defined as critical:
• Drainage design—size and layout of conveyance systems, inlet spacing, pipe sizing, and overland relief routes.
• Runoff reduction techniques—opportunities for detention, infiltration, LID/BMP practices, and any other feasible measures to keep post-development peaks at or below existing conditions.
• Erosion and sediment control—both during construction and for long-term site stability, with details that will drop straight into the SWPPP.

I expect hydraulic and hydrologic calculations (HEC-RAS, HEC-HMS, HydroCAD, or comparable), exhibits that will sit behind the civil sheets (PDF + CAD), and a narrative that ties it all together so the permitting authority can follow the logic without extra clarification. If your seal is accepted in my jurisdiction that is a plus, but I mainly need calculations and drawings that meet current stormwater and NPDES standards and can be stamped locally if required.

Deliver everything in editable formats plus a clean, ready-to-submit PDF set. Let me know your proposed approach, timeline, and any assumptions you would need from me (survey, soils, rainfall data, etc.) so we can get this moving.