First, I just need help to determine what size steam boiler and steam accumulator would be required to operate the 2 pieces of equipment I am considering purchasing.
If the required boiler and accumulator sizes are within my budget, then I will also need help to design they steam system.
The two pieces of equipment that require high pressure steam to work are an EPS pre-expander and an EPS block molding machine.
Here are their requirements of each:
Second Pass Batch Pre-expander
First pass cycle time = approx. 1-2 min
Second pass cycle time = approx. 1-1.5 min
Steam pressure = 0.4~0.8 Mpa
Steam consumption = 6-10 kg/cycle
Wind Cooling Block Molding Machine
Cycle Time = 18 min
Steam Pressure = 0.8 Mpa
Steam Consumption = 55-65 kg/cycle
How do I determine the correct boiler and steam accumulator size from looking at this data?
If more data is needed to determine the size, what specific information is required?
If the required boiler and accumulator sizes are within my budget, then I will also need help to design they steam system.
The two pieces of equipment that require high pressure steam to work are an EPS pre-expander and an EPS block molding machine.
Here are their requirements of each:
Second Pass Batch Pre-expander
First pass cycle time = approx. 1-2 min
Second pass cycle time = approx. 1-1.5 min
Steam pressure = 0.4~0.8 Mpa
Steam consumption = 6-10 kg/cycle
Wind Cooling Block Molding Machine
Cycle Time = 18 min
Steam Pressure = 0.8 Mpa
Steam Consumption = 55-65 kg/cycle
How do I determine the correct boiler and steam accumulator size from looking at this data?
If more data is needed to determine the size, what specific information is required?