steam engineering

Job ID: 37288981

Budget: $15 – $25 USD

First, I just need help to determine what size steam boiler and steam accumulator would be required to operate the 2 pieces of equipment I am considering purchasing.
If the required boiler and accumulator sizes are within my budget, then I will also need help to design they steam system.

The two pieces of equipment that require high pressure steam to work are an EPS pre-expander and an EPS block molding machine.

Here are their requirements of each:
Second Pass Batch Pre-expander
First pass cycle time = approx. 1-2 min
Second pass cycle time = approx. 1-1.5 min
Steam pressure = 0.4~0.8 Mpa
Steam consumption = 6-10 kg/cycle

Wind Cooling Block Molding Machine
Cycle Time = 18 min
Steam Pressure = 0.8 Mpa
Steam Consumption = 55-65 kg/cycle

How do I determine the correct boiler and steam accumulator size from looking at this data?

If more data is needed to determine the size, what specific information is required?
Related categories: Engineering Mechanical Engineering