Technical Drawing for Fence Post Replacement Permit (In Mississauga, Ontario, Canada)
Budget: $30 – $250 CAD
I need a technical or engineering drawing to obtain a permit for replacing fence posts near an oil pipeline belonging to Trans-Northern Pipelines Inc.
I got the locate a few days ago.
The drawing requirements are on page 14 of the crossing guidelines.
On page 4 of TNPI_Crossing_Application_Eng.pdf, more explanation is given.
Requirements:
- Must adhere to minimum requirements provided by the regulatory body (detailed list available)
- Should include necessary compliance with safety regulations
Ideal Skills:
- Experience with technical and engineering drawings
- Familiarity with regulatory requirements for construction near oil pipelines
- Attention to detail and accuracy
I got the locate a few days ago.
The drawing requirements are on page 14 of the crossing guidelines.
On page 4 of TNPI_Crossing_Application_Eng.pdf, more explanation is given.
Requirements:
- Must adhere to minimum requirements provided by the regulatory body (detailed list available)
- Should include necessary compliance with safety regulations
Ideal Skills:
- Experience with technical and engineering drawings
- Familiarity with regulatory requirements for construction near oil pipelines
- Attention to detail and accuracy