Strategic Plan & Workflow for Construction Tech Dept

Job ID: 38548018

Budget: $10 – $30 USD

I need a comprehensive working and strategic plan for my Construction Technical Department. This plan should cover both the tender stage and technical support, which involves preparing the design pack, creating shop drawings, and conducting material take-offs (MTO).

Key Areas of Focus:
1. **Tender Stage**: Assistance is required in strategizing and managing the tendering process.
2. **Technical Support**: This encompasses the preparation of the design pack including architectural, structural, mechanical, electrical, and extra low voltage (ELV) components, as well as Information and Communication Technology (ICT) elements. Also crucial is the creation of shop drawings and performing material take-offs.

My Team (Tender manager - Structure Lead - Architecture Lead - Mechanical Lead - Electrical Lead - ElV / ICT Lead - Document Controller - BIM Coordinator - Draftsmen / Modeler dep.

The ideal professional for this project should have substantial experience in construction management, technical support, and strategic planning. Proficiency in creating detailed design packs and shop drawings is essential, along with a solid understanding of tendering processes in the construction industry.