Rebar Schedule for R. Residence
Budget: $75 – $100 USD
Produce a Rebar Schedule for R. Residence. Must contain the following columns, in order from left to right:
Host Category (Strip Footings, Isolated Footings, Slab on grade, Beam on grade, Suspended Slab, Beam, Column, Wall, Lintels), Host Mark, Bar Diameter, Shape Image, Development Lengths A, B, C, D, E; Length Each Bar, Quantity, Total Bar Length, Weight (lbs).
Units: Imperial Units, feet and inches, fractional
Standard: USA
Host Category (Strip Footings, Isolated Footings, Slab on grade, Beam on grade, Suspended Slab, Beam, Column, Wall, Lintels), Host Mark, Bar Diameter, Shape Image, Development Lengths A, B, C, D, E; Length Each Bar, Quantity, Total Bar Length, Weight (lbs).
Units: Imperial Units, feet and inches, fractional
Standard: USA