Need electrical engineer MATPOWER expert
Budget: $30 – $250 USD
Using MATPOWER run the 30- bus Standard Test Feeder for 24 hours. Using 15-minute or 1-hour intervals, the model
needs to run every time step (i.e., 96 or 24) and calculate optimal set points for the
scheduled generation and dispatchable loads. We will primarily monitor the voltage
magnitude and losses at each bus, and line loading of all branches. Line loading is
defined as the magnitude of the apparent power flowing through each branch over its
MVA limit.
needs to run every time step (i.e., 96 or 24) and calculate optimal set points for the
scheduled generation and dispatchable loads. We will primarily monitor the voltage
magnitude and losses at each bus, and line loading of all branches. Line loading is
defined as the magnitude of the apparent power flowing through each branch over its
MVA limit.