Marine Project - 08/04/2023 12:14 EDT
Budget: $250 – $750 USD
We have 03 floating barge of desalination plant, need to prepare the Study of Lying of Piping under seabed from the barge connection till the Jetty.
There are 05 number of brine line connecting 300mm flexible hose and one number of Product line connecting 600mm Flexible Hoses. Other lines are sewage line , fuel line and electrical cable to the barge.
We have to submit our study as connecting the hoses from barge to jetty with all concrete support undersea bed and manifold if required as per the calculation.
Need urgent to be submitted.
There are 05 number of brine line connecting 300mm flexible hose and one number of Product line connecting 600mm Flexible Hoses. Other lines are sewage line , fuel line and electrical cable to the barge.
We have to submit our study as connecting the hoses from barge to jetty with all concrete support undersea bed and manifold if required as per the calculation.
Need urgent to be submitted.