Engineering,work

Job ID: 32094860

Budget: $250 – $750 USD

Hi
We are golden well company looking for experienced engineering who can do the all engineering also support in Procurement and construction , commissioning
Background
IGF Unit Modification for Temporary Desulfurization project has run for over three years, the effect is obvious, which reduces the content of hydrogen sulfide in the produced water, slows down the corrosion rate, and ensures the normal production. However, because the gas outlet pipeline has been running under the condition of high acid and high wet gas medium for a long time, the corrosion rate is fast and the wall thickness is seriously thinned, which generates a serious threat to the safe production.
Related categories: Engineering Industrial Design Procurement Drawing