Electrolyte ISO Trench
Budget: $30 – $50 USD
We are looking for a civil engineer who is familiar with chemical code for designing new trench from loading dock to main sewer at a chemical factory area. The location of the project is: 648 GA-334, Commerce, GA. The civil engineer must own a GA Lisence Stamp. See below for further details.
1. Whether or not double length(90') loading dock is required by code clearance when the vehicle is 45' long size
2. If 90' long clearance is required, display drawings such as pavement for the landscape section (concrete 47' x 7')
3. ISO vehicle weight is about 30 TON. This shows the steel grating specification (width: 12") drawing
4. Show Concrete Dike Top Horizontal and Chamfer Drawings
5. Storm water pipe connection and pipe (pvc) pipe diameter (?) drawing
6. For the storm water pipe connection drawing, use 2021.11.17-Containment Dike-20075. (for license submission)
7. Please show detailed drawings for the trench part
8. Sump well (2'x2') detailed drawing required (storm water pipe connection)
1. Whether or not double length(90') loading dock is required by code clearance when the vehicle is 45' long size
2. If 90' long clearance is required, display drawings such as pavement for the landscape section (concrete 47' x 7')
3. ISO vehicle weight is about 30 TON. This shows the steel grating specification (width: 12") drawing
4. Show Concrete Dike Top Horizontal and Chamfer Drawings
5. Storm water pipe connection and pipe (pvc) pipe diameter (?) drawing
6. For the storm water pipe connection drawing, use 2021.11.17-Containment Dike-20075. (for license submission)
7. Please show detailed drawings for the trench part
8. Sump well (2'x2') detailed drawing required (storm water pipe connection)