Associated Gas Utilization in Power Plants using (TRNSYS)

Job ID: 37661900

Budget: $30 – $250 USD

I wish to explore the feasibility of investing in an unprocessed associated gas powered steam plant, aiming to utilize waste gas for substantial electricity generation. The expected capacity of the power plant lies beyond 10 MW, indicating the large scale of the project. I'm seeking:

- A thorough market feasibility study
- Understanding of the economic viability of utilizing waste gas
- A breakdown of expected returns on investment

The expert should have a strong background in energy economics, engineering, and experience in investment feasibility studies. Understanding energy and environmental policies would be a plus.
Related categories: Engineering CAD/CAM