Automation of Cooling Tower
Budget: ₹100 – ₹400 INR
Automation of Cooling tower
1. inputs : Level of 3 tanks, 3 zone temperature, Water detection 4 Points.
2. Outputs : 6 On/Off , 24 DC Outputs
Scope of work
1. Making Bill of materials
2. Complete circuit diagram
3. HMI and PLC programming with test run
1. inputs : Level of 3 tanks, 3 zone temperature, Water detection 4 Points.
2. Outputs : 6 On/Off , 24 DC Outputs
Scope of work
1. Making Bill of materials
2. Complete circuit diagram
3. HMI and PLC programming with test run