electrical_engineer

Job ID: 31485151

Budget: $2 – $4 AUD

See the task and bid in hourly rate

do state how many hours this work will take see attached zipped folder also
We have 4 procedures
First procedure
1. After we switched the load bank
ON we got this results
The Volts went from 50v to 49v/ Amp 0 to 0.32A/ Watts 0 to 2w
“Keep opening switches until 1Amp”
Volts 47.5v
Amp 0.63A
Watts 19w
“Opening the next switch”
Volts 46v
Amp 0.9A
Watts 24w
——————————————————
Second procedure
Voltage 60v
Watts 21w
Ix = 0.5A
IR = 0.5A
IT = 0.8A
After removing the ORG
Voltage 60v
Watts 20w
IR =0.5A
IT=0.43A
——————————————————
Third procedure
Voltage 60v
Watts 21.5w
Ix =0.4A
IR=0.5A
IT=0.8A
——————————————————
4th procedure
Watts 33w
Amp 3A
Voltage 57v
After opening the switch on the transformer secondary
Watts 8w
Amp 3A
Voltage 57v

This is everything you need