Solar Dynamic study (Power system study) - Active Power Setpoint Control graph in PSSE or ETAP
Budget: ₹1,500 – ₹12,500 INR
Attached our submitted documents in native and PDF is for your reference and work. This was done in PSS, but now I could not get the right person in PSSE
So you can make this activity Active Power Setpoint Control – Curtailment (i.e. To simulate P setpoint at 100%, 50% and 25% rated power and monitor P & Q response)
refer to the graph of the example attached same here, needs to be prepared the same graph in any software ETAP or PSSE or other, onlyActive power setpoint control - as noteded above, no other work involved now
So you can make this activity Active Power Setpoint Control – Curtailment (i.e. To simulate P setpoint at 100%, 50% and 25% rated power and monitor P & Q response)
refer to the graph of the example attached same here, needs to be prepared the same graph in any software ETAP or PSSE or other, onlyActive power setpoint control - as noteded above, no other work involved now