Power Transfer & Fault Current Analysis

Job ID: 38795025

Budget: $30 – $250 CAD

I'm looking for an expert in power systems analysis using ETAP. This project involves several calculations based on a Load Flow Report and a project data PDF.

Tasks include:
- Calculating the Power Transfer from two upstream buses and the total Power Transfer using voltage magnitudes and angles from the Load Flow Report
- Calculating the expected fault currents for each type of fault using the Per Unit method and symmetrical components with a base value of SBASE = 100MVA
- Drawing a symmetrical component sequence network diagram for a Line to Ground fault

You will need to compare your results with those from the Load Flow Report and ETAP.

The ideal candidate would be someone with:
- Strong knowledge in power systems
- Proficiency with ETAP
- Experience in using symmetrical components for fault analysis
- Ability to interpret and work from a PDF project data file

Please provide the final report in Word format. The preferred timeline for this project is 1 week.