Electrical Power

Job ID: 36214847

Budget: $250 – $750 CAD

The owner has provided the following information to consider in their design.
 The owner has 10 acres of land.
 This is the first building on the land, and approximately 10 other buildings of similar sizes are expected to be developed. Only one utility connection is desired for the future installations.
 The owner wants part of their land to be used for renewable energy sources, such as solar.
 Up-time is essential for this owner as some of their operations are critical and cannot be interrupted.
 The owner requires one room for all of their data services.
 The owner does not want any overhead connections between buildings or to the utility.