ETAP Short Circuit, Protections Coordination and Selectivity Study
Budget: $250 – $750 USD
Here's what I'm looking for:
- ETAP Simulation for all required operation modes
- Short Circuit Calculations & Study for all required operation modes c/w Single Line Diagrams (broken
apart to display easily on A4 page size.
- Protective Device Coordination Study for all required operation modes and trips c/w device settings for
specified relay model (SE P5F30 with GOOSE communication)
- Report of the above; report c/w cover page, headers, footers, colour scheme, &c.
- Delivery of project files (*.OTI, &c.) at end of project
Here's what I will provide:
- Local Jurisdiction Professional Engineering. Once the report is completed, I will apply my P.Eng. seal
and take Professional Liability for the report and it's use in this project.
- Contract Documents received from client; including shop drawings, single line diagrams, functional and
operation modes description.
- Incoming Utility Information; once I receive from the client
- Full support for localization (Israel Electric Code Requirements and Standards, &c.)
- Any additional or missing information which you identify
The system is:
- 3x 22kV incoming utility feeds
- 3x ring distribution switchgear (22kV, 3-phase, 3-wire, 1250A, 25kA 1s)
- 22kV distribution ring c/w 3 combined traction/utility substations (2xTraction
transformers 22kV/0.585/0.585kV, 1100kVA + 1 utility 22kV/0.4kV, 250kVA)
- ETAP Simulation for all required operation modes
- Short Circuit Calculations & Study for all required operation modes c/w Single Line Diagrams (broken
apart to display easily on A4 page size.
- Protective Device Coordination Study for all required operation modes and trips c/w device settings for
specified relay model (SE P5F30 with GOOSE communication)
- Report of the above; report c/w cover page, headers, footers, colour scheme, &c.
- Delivery of project files (*.OTI, &c.) at end of project
Here's what I will provide:
- Local Jurisdiction Professional Engineering. Once the report is completed, I will apply my P.Eng. seal
and take Professional Liability for the report and it's use in this project.
- Contract Documents received from client; including shop drawings, single line diagrams, functional and
operation modes description.
- Incoming Utility Information; once I receive from the client
- Full support for localization (Israel Electric Code Requirements and Standards, &c.)
- Any additional or missing information which you identify
The system is:
- 3x 22kV incoming utility feeds
- 3x ring distribution switchgear (22kV, 3-phase, 3-wire, 1250A, 25kA 1s)
- 22kV distribution ring c/w 3 combined traction/utility substations (2xTraction
transformers 22kV/0.585/0.585kV, 1100kVA + 1 utility 22kV/0.4kV, 250kVA)