Connection of the wind farm to the transmission network

Job ID: 32009901

Budget: €50 – €100 EUR

You've to prepare a project report.
Task -
1. Select generation source/sources based on power
2. Establish technical indicators of generation sources (active, reactive power, voltage, etc.)
3. Selection of conductors and transformers. According to the corrected power of generation sources and the type of connection specified in the task, select the connection scheme of the generating sources, devices (power transformers, etc.), determine their parameters, losses of reactive power.
4. Calculate the reactive power generated by the line/lines according to the line type and length specified in the task.
5. Calculate the reactive load and voltage at the end of the power line to minimise the loss of active power on the line

More details will be given after accepting the project