Update Residential Electrical Plan
Budget: $30 – $250 AUD
I already have a plan with electrical drawings with lights only, but recent remodeling Specifically, the new plan must show extra gpo lines and breaker assignments for the while fitting cleanly into the existing panel schedule and respecting current load calculations.
You will start from my current PDF/CAD files (I can supply both) and layer in:
• Clearly labeled new branch circuits for each of the three rooms
• Updated panel schedule reflecting the added breakers and loads
• Revised single-line diagram, if required, so the inspector can see the changes in context
Please keep symbols and notation consistent with the original drawings to as3000 standards. I will review a draft first, mark up any tweaks, and then need the final deliverable in both PDF and the original editable format (DWG or similar).
Turnaround of 2 week is ideal; let me know if you need anything else from my side to get started.
You will start from my current PDF/CAD files (I can supply both) and layer in:
• Clearly labeled new branch circuits for each of the three rooms
• Updated panel schedule reflecting the added breakers and loads
• Revised single-line diagram, if required, so the inspector can see the changes in context
Please keep symbols and notation consistent with the original drawings to as3000 standards. I will review a draft first, mark up any tweaks, and then need the final deliverable in both PDF and the original editable format (DWG or similar).
Turnaround of 2 week is ideal; let me know if you need anything else from my side to get started.
Related categories:
Electronics
CAD/CAM
Electrical Engineering
AutoCAD
Drafting
Technical Documentation
Vector Design