PowerBI data configuration
Budget: $250 – $750 USD
I have an Excel file from the Primavera scheduling software. I need help organizing the data to work within PowerBI.
I am missing some simple data structure steps and I am looking for help. The real issue is unpacking the Excel file from Primavera into something that PowerBI can live with.
I am missing some simple data structure steps and I am looking for help. The real issue is unpacking the Excel file from Primavera into something that PowerBI can live with.