Site Setting-Out & Datums
Budget: £250 – £750 GBP
I’m getting ready to break ground on a building-construction job and need an experienced setting-out professional to visit site, establish reliable datums, and mark all reference points before trades arrive.
Scope of work
• Arrive on site with your own calibrated total station or equivalent survey kit.
• Establish a primary benchmark and at least one back-up datum tied to OS/grid coordinates.
• Set out gridlines at agreed offsets so foundations, columns, walls, and partitions can be located accurately later.
• Pin, spray, or nail markers clearly; label them so every team on site can recognise the system.
• Supply a concise setting-out sketch or CAD layout showing coordinates, offsets, and benchmark levels so we have a permanent record for the site file.
What I’ll provide
• Latest PDF drawings and a DWG if you prefer.
• Site access and a designated contact to walk you through any constraints.
Acceptance
Markers must be within ±5 mm horizontally and ±3 mm vertically of the agreed control points. All coordinates to be handed over the same day you complete the work.
If you’re comfortable handling the full layout and can slot the visit in within the next week, I’d love to hear how soon you can mobilise and what equipment you’ll bring.
Scope of work
• Arrive on site with your own calibrated total station or equivalent survey kit.
• Establish a primary benchmark and at least one back-up datum tied to OS/grid coordinates.
• Set out gridlines at agreed offsets so foundations, columns, walls, and partitions can be located accurately later.
• Pin, spray, or nail markers clearly; label them so every team on site can recognise the system.
• Supply a concise setting-out sketch or CAD layout showing coordinates, offsets, and benchmark levels so we have a permanent record for the site file.
What I’ll provide
• Latest PDF drawings and a DWG if you prefer.
• Site access and a designated contact to walk you through any constraints.
Acceptance
Markers must be within ±5 mm horizontally and ±3 mm vertically of the agreed control points. All coordinates to be handed over the same day you complete the work.
If you’re comfortable handling the full layout and can slot the visit in within the next week, I’d love to hear how soon you can mobilise and what equipment you’ll bring.
Related categories:
CAD/CAM
Building Architecture
Home Design
AutoCAD
Building Design
3D CAD
Construction
Construction Management