New House Building Materials quantities Takeoff USA Florida state
Budget: $15 – $25 USD
I need an itemized quantities takeoff of all new house materials.
Drawings: I will provide the plans, elevations, sections, and details after i receive your work example.
Areas to measure:
• Exterior walls
• Attic / roof deck (essentially everything above the ceiling line)
Material: R-value-rated rigid foam boards only. No fiberglass, spray foam, or hybrid products are under consideration for this takeoff.
What I expect:
1. A spreadsheet (Excel or Google Sheets) showing square footage, board count by thickness, and a separate column for recommended waste/overage.
2. A brief summary page noting any assumptions (e.g., framing spacing, blocking, penetrations).
Acceptance criteria: totals must balance within ±3 % of a spot check, annotations must be legible, and the file must be organized so my supplier can quote directly from it.
I'd like a first draft within three business days from the moment you receive the files. Let me know what takeoff software you will use (Bluebeam, PlanSwift, or similar).
Drawings: I will provide the plans, elevations, sections, and details after i receive your work example.
Areas to measure:
• Exterior walls
• Attic / roof deck (essentially everything above the ceiling line)
Material: R-value-rated rigid foam boards only. No fiberglass, spray foam, or hybrid products are under consideration for this takeoff.
What I expect:
1. A spreadsheet (Excel or Google Sheets) showing square footage, board count by thickness, and a separate column for recommended waste/overage.
2. A brief summary page noting any assumptions (e.g., framing spacing, blocking, penetrations).
Acceptance criteria: totals must balance within ±3 % of a spot check, annotations must be legible, and the file must be organized so my supplier can quote directly from it.
I'd like a first draft within three business days from the moment you receive the files. Let me know what takeoff software you will use (Bluebeam, PlanSwift, or similar).