Interior Demolition Takeoff & Written Estimate (Bid Element) from Blueprints
Budget: $10 – $30 USD
We are seeking an experienced estimator to prepare a full interior demolition takeoff and HARD-BID estimate from provided blueprint PDFs.
This estimate will be used for a fixed-price contractor bid. Conceptual estimates, rough budgets, or high-level approximations are not acceptable. Quantities, pricing logic, and assumptions must be clearly defined and defensible.
Scope of Work
Estimator will review drawings and produce the following:
1) Detailed Quantity Takeoff
Interior partitions – LF by wall type with stated height assumptions
Ceilings – SF by type
Flooring – SF by type
Base – LF
Doors & frames – EA
Casework / millwork – LF or EA
Specialties – EA where applicable
MEP demolition as allowances unless explicitly shown on drawings
Optional but preferred: debris volume (CY) and disposal assumptions
2) Hard-Bid Written Estimate (Bid Element)
Itemized line-item pricing including:
Quantity
Unit cost
Extended total
Separate pricing lines for:
Interior demolition labor
Hauling and disposal
Protection / temporary measures / general conditions
Clear, written assumptions and exclusions
Pricing must reflect a fixed-price bid, not a conceptual range
Required Deliverables
Excel file with detailed takeoff and pricing
PDF hard-bid estimate summary (bid element)
Marked-up plans or takeoff screenshots showing measured areas
Estimator Requirements
Proven experience producing hard-bid interior demolition estimates
Strong understanding of selective demolition sequencing and protection
Ability to interpret architectural and demolition drawings accurately
Clear documentation of assumptions (wall heights, ceiling types, scope limits)
Original work only — no generic or reused estimate templates
Conceptual estimates, budget pricing, or unsubstantiated allowances will not be accepted
Missed Scope / Accuracy Responsibility
This estimate will be relied upon for a fixed-price bid. By accepting this task, the estimator acknowledges:
All scope reasonably inferable from the drawings must be captured in the takeoff and estimate.
If significant scope items are omitted due to estimator oversight (not due to missing or conflicting drawings), the estimator may be required to:
Revise the estimate at no additional cost, and/or
Accept a reasonable reduction in compensation reflecting the value of the missed scope.
Discrepancies between the takeoff and drawings must be clearly identified as assumptions or exclusions.
This requirement is intended to ensure diligence and accuracy consistent with hard-bid estimating standards.
Standard Exclusions (Unless Clearly Indicated on Drawings)
Hazardous materials (asbestos, lead, mold)
Structural demolition
Fireproofing removal
Underground or concealed conditions
Budget & Schedule
Pricing: Fixed price required
Turnaround: __1_ day from receipt of complete drawings
This estimate will be used for a fixed-price contractor bid. Conceptual estimates, rough budgets, or high-level approximations are not acceptable. Quantities, pricing logic, and assumptions must be clearly defined and defensible.
Scope of Work
Estimator will review drawings and produce the following:
1) Detailed Quantity Takeoff
Interior partitions – LF by wall type with stated height assumptions
Ceilings – SF by type
Flooring – SF by type
Base – LF
Doors & frames – EA
Casework / millwork – LF or EA
Specialties – EA where applicable
MEP demolition as allowances unless explicitly shown on drawings
Optional but preferred: debris volume (CY) and disposal assumptions
2) Hard-Bid Written Estimate (Bid Element)
Itemized line-item pricing including:
Quantity
Unit cost
Extended total
Separate pricing lines for:
Interior demolition labor
Hauling and disposal
Protection / temporary measures / general conditions
Clear, written assumptions and exclusions
Pricing must reflect a fixed-price bid, not a conceptual range
Required Deliverables
Excel file with detailed takeoff and pricing
PDF hard-bid estimate summary (bid element)
Marked-up plans or takeoff screenshots showing measured areas
Estimator Requirements
Proven experience producing hard-bid interior demolition estimates
Strong understanding of selective demolition sequencing and protection
Ability to interpret architectural and demolition drawings accurately
Clear documentation of assumptions (wall heights, ceiling types, scope limits)
Original work only — no generic or reused estimate templates
Conceptual estimates, budget pricing, or unsubstantiated allowances will not be accepted
Missed Scope / Accuracy Responsibility
This estimate will be relied upon for a fixed-price bid. By accepting this task, the estimator acknowledges:
All scope reasonably inferable from the drawings must be captured in the takeoff and estimate.
If significant scope items are omitted due to estimator oversight (not due to missing or conflicting drawings), the estimator may be required to:
Revise the estimate at no additional cost, and/or
Accept a reasonable reduction in compensation reflecting the value of the missed scope.
Discrepancies between the takeoff and drawings must be clearly identified as assumptions or exclusions.
This requirement is intended to ensure diligence and accuracy consistent with hard-bid estimating standards.
Standard Exclusions (Unless Clearly Indicated on Drawings)
Hazardous materials (asbestos, lead, mold)
Structural demolition
Fireproofing removal
Underground or concealed conditions
Budget & Schedule
Pricing: Fixed price required
Turnaround: __1_ day from receipt of complete drawings