Industrial Metal Formwork Shuttering

Job ID: 40492737

Budget: ₹750 – ₹1,250 INR

I need an experienced sariya shuttering crew to take charge of the metal formwork on an upcoming industrial build. Your team will handle two core responsibilities from day one: erecting the temporary steel structures that shape each pour, and remaining on-site during concrete placement to keep everything plumb, level, and safe.

The project runs on a tight schedule, so I expect you to arrive with the necessary tools, props, tie bars, and safety gear, coordinate smoothly with my concrete and rebar subcontractors, and deliver clean, accurately aligned forms that meet specified tolerances. All work must comply with current site safety regulations and the structural engineer’s drawings.

Provide:
• Crew size and skill breakdown
• Recent industrial projects that used metal formwork
• Daily or weekly output you can sustain (m² of formwork)
• Your proposed start date and availability window

Clear communication, disciplined housekeeping, and adherence to pour sequences are essential. Once we agree on scope and timing, I’ll forward structural drawings and the site logistics plan so you can finalize your method statement and risk assessment.