Dammam BOQ Verification & Pricing
Budget: $250 – $750 USD
I have uploaded the file “BOQ询价清单表(技术、商务)20250923” together with its full drawing set in the shared drive. The cells already highlighted there define our exact bidding scope.
What I need now is a fully priced Bill of Quantities that has been double-checked item-by-item against those drawings and any supporting documents. Quantities must be re-measured; if you spot an omission or find that a listed figure needs correction, add a new line or revise the existing one and flag the change clearly. All work has to respect Saudi Building Codes (SBC) and their aligned ASTM / British references.
Please send back the completed package within four calendar days.
Deliverables
• Re-verified quantity sheet (with mark-ups or comments showing every adjustment)
• Final priced BOQ ready for submission
• Short clarification note for any assumptions or extra items added
If anything in the drive link is unclear, message me straight away so we keep the timeline on track.
What I need now is a fully priced Bill of Quantities that has been double-checked item-by-item against those drawings and any supporting documents. Quantities must be re-measured; if you spot an omission or find that a listed figure needs correction, add a new line or revise the existing one and flag the change clearly. All work has to respect Saudi Building Codes (SBC) and their aligned ASTM / British references.
Please send back the completed package within four calendar days.
Deliverables
• Re-verified quantity sheet (with mark-ups or comments showing every adjustment)
• Final priced BOQ ready for submission
• Short clarification note for any assumptions or extra items added
If anything in the drive link is unclear, message me straight away so we keep the timeline on track.