Civil Engineer Compliance Letter
Budget: $10 – $30 AUD
A short, signed letter from a practising civil engineer is required to confirm that the existing batter will remain stable once the decorative rocks are taken away. The document must satisfy local regulatory officers who need formal assurance before approving the works.
The letter has to:
• Identify and describe the exact site (location, dimensions, slope geometry).
• Reference the calculations that demonstrate stability, including any factors of safety you consider appropriate.
• Note the materials presently in the batter, the rocks to be removed, and any methods or controls you recommend for safe removal.
• Be written on your professional letterhead, carry your registration details, and be suitable for submission to council.
I can supply photos and any other information you might need as soon as we start. A quick turnaround would be appreciated so the project schedule stays on track.
The letter has to:
• Identify and describe the exact site (location, dimensions, slope geometry).
• Reference the calculations that demonstrate stability, including any factors of safety you consider appropriate.
• Note the materials presently in the batter, the rocks to be removed, and any methods or controls you recommend for safe removal.
• Be written on your professional letterhead, carry your registration details, and be suitable for submission to council.
I can supply photos and any other information you might need as soon as we start. A quick turnaround would be appreciated so the project schedule stays on track.