stormwater management plan for caravan park
Budget: $30 – $250 AUD
Very small caravan park of 12 sites at this stage.
Straightforward crushed gravel road, low rainfall, just have swales on the side of the road.
I have the site level, road design, caravan park layout with gps coordinates.
I need someone with appropriate qualifications recognised in Australia, I think there is now mutual recognition with Indian universities of the appropriate qualifications
Condition 9
A Stormwater Management Plan shall be prepared for the development site by a person with appropriate
engineering and hydrological qualifications and expertise. The subject Plan shall consider existing land and
proposed development infrastructure (areas of cut/fill, batter slopes, compacted gravel areas etc) and assess
stormwater flow paths, management of scouring, stormwater volumes, capability of intended retention basins
(including for significant storm events), and water quality within the retention basins. The subject Plan must be
finalised to the written satisfaction of Council and the Coast Protection Board prior to the commencement of the
development of the site for tourist accommodation / tourist development purposes.
Straightforward crushed gravel road, low rainfall, just have swales on the side of the road.
I have the site level, road design, caravan park layout with gps coordinates.
I need someone with appropriate qualifications recognised in Australia, I think there is now mutual recognition with Indian universities of the appropriate qualifications
Condition 9
A Stormwater Management Plan shall be prepared for the development site by a person with appropriate
engineering and hydrological qualifications and expertise. The subject Plan shall consider existing land and
proposed development infrastructure (areas of cut/fill, batter slopes, compacted gravel areas etc) and assess
stormwater flow paths, management of scouring, stormwater volumes, capability of intended retention basins
(including for significant storm events), and water quality within the retention basins. The subject Plan must be
finalised to the written satisfaction of Council and the Coast Protection Board prior to the commencement of the
development of the site for tourist accommodation / tourist development purposes.