railway engineering design -- 2
Budget: $30 – $250 USD
• Find the right R for each horizontal curve.
• Draw one typical cross-section for tangent segments (AUTOCAD)
• Draw a cross section for each curve showing the superelevation (AUTOCAD)
• Find the required HP for following vertical profile assuming max train weight is 1800 tonne.
• Operation scheduling
• Depth for ballast + suballast
Project report layout:
The project report should be as professional as possible you need to include a section for each part of the design and explain the methods used for the design. The report should include sections such as
• introduction
• design standards
• ballast design
• subballast design
• geometric design
• required HP
• operation timetabling
• Draw one typical cross-section for tangent segments (AUTOCAD)
• Draw a cross section for each curve showing the superelevation (AUTOCAD)
• Find the required HP for following vertical profile assuming max train weight is 1800 tonne.
• Operation scheduling
• Depth for ballast + suballast
Project report layout:
The project report should be as professional as possible you need to include a section for each part of the design and explain the methods used for the design. The report should include sections such as
• introduction
• design standards
• ballast design
• subballast design
• geometric design
• required HP
• operation timetabling