Structural Estimation for 5 Sunset Lane

Job ID: 38933330

Budget: $30 – $250 USD

I want you to verify to take offs that I had another estimator create, your job is to just check this work below against the attached drawings.

In other words, you are just checking the below information by reviewing the drawing set to verify the accuracy. If you find any errors you just need to highlight the error and put what the correct answer is. The final result will be that all of the lines that are referenced here contain accurate information whether it is a quantity, takeoff, or count. If there is any large item that is missing that you feel needs to be added please add it and indicate in the document that you have done so.

Here is where the document for review begins:

-------------

Referenced Sheets:

S-0: General Structural Notes

S-0.1: Wind Pressure Diagrams

S-0.2: Structural Notes Continued

S-1.0: Foundation Plan

S-1.1: Ground Floor Framing Plan

S-2.0: Second Floor Framing Plan

S-2.1: Roof Framing Plan

S-3.0: Beam Schedule

S-3.1: Column Schedule

S-4.0: Structural Steel Details

S-5.0: Wall Sections and Details

S-6.0: Miscellaneous Details



---

Scope of Work and Quantities

Mobilization and Site Setup (S-0)

Temporary fencing: 400 linear feet

OSHA-compliant barriers and signage

Temporary facilities: site office, sanitation facilities, material storage


Layout and Benchmarking (S-1.0)

Benchmark control points for alignment

Marking for 72 piles, 18 grade beams, 24 columns, and slab edges


Excavation and Trenching (S-1.0)

Excavation for 72 auger-cast piles

Trenches for 18 grade beams and utility crossings


Concrete Piles (S-1.0)

72 auger-cast piles, 14" diameter, 35' deep

Reinforcement: (4) #6 vertical bars, #3 ties @ 12" O.C. in the top 14'


Pile Caps (S-1.1)

PC-1: 20 occurrences, 4'-0" x 2'-4", (3) #6 bars each way, top and bottom

PC-2: 6 occurrences, 8'-0" x 4'-0", (6) #6 bars each way, top and bottom


Grade Beams (S-1.1)

GB-1: 18 occurrences, 16" x 24", (3) #5 top/mid/bottom, #3 stirrups @ 10" O.C.

GB-2: 12 occurrences, 24" x 24", (3) #6 top/mid/bottom, #3 stirrups @ 9" O.C.

GB-3: 8 occurrences, 12" x 12", (2) #5 top/mid/bottom, #3 stirrups @ 24" O.C.


Ground Floor Slab (S-1.1)

3,500 sq. ft., 6" reinforced concrete slab

Vapor barrier: 6-mil polyethylene

Control joints installed as specified


Second Floor Slab (S-2.0)

2,800 sq. ft., 6" suspended reinforced concrete slab

Embedded MEP sleeves: 50 total

Temporary shoring during curing phase


Balcony Slabs (S-2.1)

550 sq. ft. total

Waterproof membrane and drainage outlets


Concrete Beams (S-3.0)

B100: 8"x12", 14 occurrences, (2) #5 top/bottom, #3 stirrups @ 12" O.C.

B101: 12"x24", 10 occurrences, (2) #5 top/bottom, #3 stirrups @ 12" O.C.

Tie Beams (T-A): 8"x12", 22 occurrences, (2) #5 top/bottom, #3 stirrups @ 12" O.C.


Concrete Columns (S-3.1)

8"x12": 12 occurrences, (4) #5 vertical bars, #3 ties @ 8" O.C.

12"x12": 8 occurrences, (4) #6 vertical bars, #3 ties @ 12" O.C.

12"x24": 4 occurrences, (8) #6 vertical bars, #3 ties @ 12" O.C.


Structural Steel (S-4.0)

W12x152, W14x257, W8x35 Beams: 6 total

HSS Columns: 4"x4"x1/4", 6"x6"x1/2": 8 total

Includes plates, welded and bolted connections


Embedded Hardware (S-4.0)

Anchor bolts: 150 total

Base plates: 18 total

Embedded dowels and conduits: 50 total


Waterproofing and Sealants (S-6.0)

Waterproof membranes: 1,200 sq. ft. coverage

Joint sealants: 800 linear feet


Inspections and Testing (S-6.0)

Compression tests: 10 tests

Concrete cylinder tests: 20 tests

Pile load tests: 5 tests


Final Site Cleanup (S-6.0)

Removal of temporary facilities

Final grading and restorations