Road engineering Brightwood Shore Drive
Budget: $1,500 – $3,000 USD
Township requires civil engineering for a 1.25 mile drive. minimum paving width of 20 feet, with 24 feet preferred, and at least 7” paved thickness. Would like an estimate for engineering services as we have to put together an estimate for property owners prior to proposing the project to township supervisors.